Terraplas Installation at Wimbley Stadium – May/June 2014

From International Football Match to World Championship Boxing Venue in just 18 hours!! The fastest turn-around of all time!

Watch the time-lapse installation:

Arena Seating at Froch Groves 2 Wembley

Timetable:

MAY 30th

8:00pm
England plays Peru in a ‘friendly’ match pre- the Brazil World Cup.
England wins 3 – 0

10:00pm
Patrons leave – Wembley crews commence laying their Terraplas turf
protection in preparation for the Carl Froch  v  George Groves Super Middleweight
title Fight

MAY 31st

4:00am
Completion of fitting 10,000m² of Wembley’s own Terraflor® and Terratrak®

12 noon
Completion of ring-build, seats, lights, sound etc ready for gates to open at 2:00pm

7:00pm
Fight night commences, with the ‘main event’ kicking off at 10pm and ending in
round eight with a devastating right hand punch from Carl Froch that knocked out
the challenger.

10:00pm
Reconfiguration of the format commences in preparation for 3 nights of sell-out
“One Direction” concerts, with in excess of 250,000 fans attending on 6th, 7th & 8th
June.

Terraplas – Why would you even consider using anything else?

Advertisements